National mobility concept · pre-feasibility

Build evidence
before lines

The revised 2052 concept separates railway infrastructure, passenger services and access objectives. Existing and restorable rail comes first; new mountain rail is no longer assumed simply because a region needs better transport.

Independent pre-feasibility concept. This is not an approved Government of Armenia programme, an operator commitment or an international agreement.

Key change. The earlier R1–R7 full-build idea is retired. The public concept now has four core rail corridors, announced or conditional regional interfaces and conditional access studies.

2027–2052 horizonConstant 2026 USDEnglish + ArmenianUpdated 24 Oct 2026
4core rail corridors: R1–R4
3 viewsstatus, passenger services and terrain are separated
Gate SSouth Armenia becomes a multimodal access decision
No fixed totalthe programme is repriced only after scope is fixed

Evidence and arithmetic audit

Clear about certainty

Facts separated

Observed data, planning targets, assumptions and decision gates use different labels

Totals reconciled

Earlier $18.95–29.30bn sum is archived; the revised programme needs fresh pricing

Alternatives retained

Gate S compares regional reopening, coach, feeder and road investment; no new domestic mountain rail is a valid outcome

Unknowns left open

Annual demand, revenue, subsidy, fleet and power are not invented before modelling

Direct trains ≠ direct tracks

A passenger should not have to change trains simply because the infrastructure corridor ID changes. Where capacity, rolling stock and operating rules allow, one train can continue across several corridors. A buildable railway still has to compete on door-to-door time and whole-life cost.

Infrastructure

Where tracks can realistically exist

Service

Where one train can continue

Time

Whether the journey is competitive

Gate

Whether construction is justified

Map system

Two questions,
three views

The two network maps are interactive. Use the controls and legends, then select a corridor or service. The third view tests terrain constraints without drawing a supposed railway alignment.

ARMENIA · SCHEMATICYerevanGyumriVanadzorAyrumHrazdanFioletovoDilijanIjevanShorzha / SotkYeraskhNakhchivanNrnadzorAgarakAparan studyMylerAragats resortGyumri–Kars · official interfaceYeraskh–Nakhchivan · regional / conditionalNrnadzor–Agarak · TRIPP interface
Colour shows infrastructure status — not passenger-line identityTourism demand point · not a stationRegional interface node

01 · Infrastructure & engineering status

Open full map ↗

Colour represents engineering status. The southern mountain study area is kept off this route map and shown only as an unselected zone on Map 03

Passenger services · illustrative
GEORGIA · internationalTÜRKİYEAZERBAIJAN / NAKHCHIVAN · conditional transitYerevanGyumriHrazdanSevanShorzhaYeraskhVanadzorAyrumTbilisi / BatumiFioletovoDilijanIjevanKarsNakhchivanSouth Armenia interface

Direct trains ≠ direct tracks. Solid: existing / core patterns · dashed: conditional services · schematic, not a timetable. Drag to move; use + / − to zoom. Select a line for conditions.

02 · Passenger services · illustrative

Open full map ↗

One-seat service patterns, with conditional services clearly separated from existing / core services

03 · Topographic feasibility

Terrain before alignment

A terrain screening layer, not a railway alignment. Broad zones show where relief is likely to drive gradients, curves, tunnels, viaducts, winter operations and emergency-access requirements.

Aragats plateauBazum crossingVardenyatsVayk–JermukSisian–KajaranKajaran–MeghriSouthern mountain study zone · no alignment selectedMylerAragats resort study area
Moderate constraintHigh constraintVery high / tunnel-intensiveTourism demand points · not stationsSouthern mountain study zone · no alignment selected
Endpoint elevations can mislead

Vanadzor and Stepanavan can appear similar in endpoint elevation while the Bazum barrier between them controls alignment, gradient and tunnel demand. Every ridge and valley between two endpoints matters.

Screening only · replace with official DEM, surveyed profiles, geology and seismic investigations before route selection

03 · Topographic feasibility

Relief-based screening of the crossings that need profiles, geology and tunnel evidence before any route can be selected

Every point is identified

Select a point to see its place name, station type, lines, status and programme phase

A blank area is not abandoned

Rail serves strong corridors; guaranteed buses and road investment complete lower-demand access

Lines are not surveyed routes

All new corridors require official GIS, alternatives, fieldwork, environmental review and design

Official references, not delivery

The Armenia–US Charter published 24 October refers to Gyumri–Kars rehabilitation in connection with TRIPP goals. The 17 September draft TDC charter and shareholders’ agreement remain preparatory documents. Official statements on 5–6 October refer to possible regional railway reopening and a Persian Gulf–Black Sea connection, but none of these sources approves a direct Armenia–Iran railway, final alignment, funding commitment, construction award or opening date

Programme reset

2027–2052 without automatic construction

Dates describe decision windows and deliverables. A study corridor does not become a built railway simply because the calendar reaches 2052.

2027–2031

Evidence first

Official GIS/DEM, asset and safety audit, demand model, preliminary profiles and engineering / hazard screening; Gate 0 and Gate S evidence
2030–2038

Fix the backbone

Justified R1–R4 renewal, stations and measured service improvements; R3 restoration only after engineering and demand validation
2030s–2040s

Open interfaces conditionally

TDC corporate formation is under preparation, but Gyumri–Kars, Yeraskh–Nakhchivan and Nrnadzor–Agarak still depend on design, signed agreements, border operations and funding; C1 needs revalidation
2040s–2052

Build only passed gates

Access studies may become rail, coach, feeder or road improvements, or be deferred; no fixed Kapan or Meghri railway completion year

Explore the project

A short home page,
detailed project sections

The project is organised by the decisions a government, funder, operator and community would actually need to make.

Announced process

Gyumri–Kars

Reported design procurement, the Charter’s reference to TRIPP goals and the remaining conditions before international operation

Explore Gyumri–Kars →
01

Network & regions

Relief map, R1–R4 and an access passport for every marz plus Yerevan

Open network →
02

Service & demand

Timetable tests, fleet logic, demand cases, freight evidence, fares and energy

Open service plan →
03

Options & costs

Four pricing buckets, revised scope, South Armenia Access Gate and fiscal tests

Compare options →
04

Master plan & delivery

Integrated master plan, 2027–31 work, surveys, climate, safeguards and six gates

Open delivery plan →
05

Evidence & full plan

Evidence labels, audit, priority sources and the complete 15-chapter report

Read full plan →

The first deliverable

One integrated transport master plan

Before selecting a railway route, Armenia should compare rail, roads, buses, aviation, freight and no-build options through one demand model, one GIS, common standards and one fiscal envelope. The plan decides which problem each mode should solve and in what order.

See what the master plan contains →

Do next, not someday

The 2027–2031 decision window

2027

Programme authority, data room, asset and safety audit

2028

National demand model, official GIS and alternatives longlist

2029

Field surveys, reference case, consultation and Gate 0

2030

Funded reference designs, procurement and service specification

2031

Early renewal works, measured benefits and updated decisions